Direct engineering RFQ & STEPinquiry@thruboreslipring.com ↗

FIVE-STEP MODULAR ENGINEERING BRIEF

Custom slip ring configurator.

Define the bore, build requested power-path and data-interface schedules with CSV export, then add duty and harness. Review every value before sending the same brief by web form or email.

MODULAR ENGINEERING BRIEF

Configure the rotating interface

1 / 5

Start with what you know. Configuration codes identify a request, not a released SKU or a stock reservation.

Engineering configuration inputs

01 · Keep the shaft and envelope precise.

2 in = 50.8 mm; 50 mm is a separate size. 1/8 in = 3.175 mm; 3 mm is separate. Include shaft tolerance, runout and lead exit clearance. Final dimensions and combined ratings require a drawing review.

Prefer to attach drawings in your email?

Copy or download the complete current brief at any step. Apply or resolve any pending power or interface-row edits first. Review step 4 before sending: electrical briefs initially select two harness options; a new separate-RF image request starts with neither selected. Attach approved drawings in your own email client.

No payment is collected. Ratings, drawing availability, lead time and commercial terms are confirmed for the agreed configuration.